Bellflower, CA
Flat roofs do not shed water. They hold it back.
Flat sections on an otherwise pitched house are where the leaks are. Additions, porch roofs, and the bit over the garage.
Or call (562) 263-3966Describe the flat roofing job
Three questions, then the address. Up to three Bellflower contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Bellflower and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.
- How the flat section is flashed into adjoining walls and pitched roofs
- Drain, scupper and overflow provision
- Whether a coating is being sold as a repair
- Which membrane, and how the seams are joined
- Whether water ponds anywhere after rain
Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.
Modified bitumen is the rolled, torched or self-adhered system you see on older flat additions. Cheaper, and shorter-lived.
Coatings can buy a sound roof several years. Coating a failed roof buys you a wet roof with a fresh top coat on it.
Locally
Then, less dramatically: morning fog that sits on the roof until mid-morning. It is why two identical houses on the same street can be ten years apart on the same roof, depending on which way they face.
About flat roofing here
Do I have to hire anyone?
Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.
What should I do to prepare?
Clear the driveway, protect attic storage from falling dust, and plan for two loud days. Agree in advance where the dumpster goes and who sweeps for nails.
Do I need a permit?
Almost certainly, for a full replacement. The contractor should pull it, and the fee should be a visible line on the quote rather than a surprise.
How much deposit is normal?
A third at most, and never the full amount. Pay the balance when the job is finished and you have walked it. Some states cap the deposit by law.
Find out what it costs
No cost, no obligation, and never more than three contractors.
